Satisfactory · Rotors stators and motors | Compare
Choose a variant below. Closely related recipes, conditions or opening branches are collected here so you can compare them without moving between almost identical pages.
The version and limits of the original source apply to every entry. Quantities and requirements belong to the named variant; do not add alternative recipes or opening lines together.
These options share a planning task. Their differences stay visible in the individual rows and calculators.
Using this reference
Choose a recipe for Rotors stators and motors, then choose the machine that will run it. The per-minute rate uses the recorded output, recipe duration and machine speed. Batch quantities answer how many materials a fixed number of operations consumes; the rate column answers how fast one selected machine processes them.
Increase the target rate to see the number of whole machines needed. Rounding up leaves some nominal spare capacity. This is a direct production step, not a balanced factory: upstream supply, transport and temporary interruptions still need to support the stated rate.
Motor
5 per minute · Buildings needed (rounded up): 12
| Source data | Batches | per minute |
|---|---|---|
| − Rotor | 2 | 10 |
| − Stator | 2 | 10 |
| + Motor | 1 | 5 |
Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.
per minute = Batches × 60 × Production building / seconds per cycle
Motor · 12 Seconds
Rotor × 2 + Stator × 2 → Motor × 1
Station: Assembler
Alternate: Electric Motor · 16 Seconds
Electromagnetic Control Rod × 1 + Rotor × 2 → Motor × 2
Station: Assembler
Alternate: Rigor Motor · 48 Seconds
Rotor × 3 + Stator × 3 + Crystal Oscillator × 1 → Motor × 6
Station: Manufacturer
A worked example
Suppose you want 4 × Motor. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Rotor × 8 and Stator × 8.
Check the source ↗ · 1.0 snapshot
Stator
5 per minute · Buildings needed (rounded up): 12
| Source data | Batches | per minute |
|---|---|---|
| − Steel Pipe | 3 | 15 |
| − Wire | 8 | 40 |
| + Stator | 1 | 5 |
Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.
per minute = Batches × 60 × Production building / seconds per cycle
Stator · 12 Seconds
Steel Pipe × 3 + Wire × 8 → Stator × 1
Station: Assembler
Alternate: Quickwire Stator · 15 Seconds
Steel Pipe × 4 + Quickwire × 15 → Stator × 2
Station: Assembler
A worked example
Suppose you want 4 × Stator. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Steel Pipe × 12 and Wire × 32.
Check the source ↗ · 1.0 snapshot
Rotor
4 per minute · Buildings needed (rounded up): 15
| Source data | Batches | per minute |
|---|---|---|
| − Iron Rod | 5 | 20 |
| − Screw | 25 | 100 |
| + Rotor | 1 | 4 |
Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.
per minute = Batches × 60 × Production building / seconds per cycle
Rotor · 15 Seconds
Iron Rod × 5 + Screw × 25 → Rotor × 1
Station: Assembler
Alternate: Copper Rotor · 16 Seconds
Copper Sheet × 6 + Screw × 52 → Rotor × 3
Station: Assembler
Alternate: Steel Rotor · 12 Seconds
Steel Pipe × 2 + Wire × 6 → Rotor × 1
Station: Assembler
A worked example
Suppose you want 4 × Rotor. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Iron Rod × 20 and Screw × 100.
Check the source ↗ · 1.0 snapshot
Turbo Motor
1.875 per minute · Buildings needed (rounded up): 32
| Source data | Batches | per minute |
|---|---|---|
| − Cooling System | 4 | 7.5 |
| − Radio Control Unit | 2 | 3.75 |
| − Motor | 4 | 7.5 |
| − Rubber | 24 | 45 |
| + Turbo Motor | 1 | 1.875 |
Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.
per minute = Batches × 60 × Production building / seconds per cycle
Turbo Motor · 32 Seconds
Cooling System × 4 + Radio Control Unit × 2 + Motor × 4 + Rubber × 24 → Turbo Motor × 1
Station: Manufacturer
Alternate: Turbo Electric Motor · 64 Seconds
Motor × 7 + Radio Control Unit × 9 + Electromagnetic Control Rod × 5 + Rotor × 7 → Turbo Motor × 3
Station: Manufacturer
Alternate: Turbo Pressure Motor · 32 Seconds
Motor × 4 + Pressure Conversion Cube × 1 + Packaged Nitrogen Gas × 24 + Stator × 8 → Turbo Motor × 2
Station: Manufacturer
A worked example
Suppose you want 4 × Turbo Motor. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Cooling System × 16, Radio Control Unit × 8, Motor × 16, and Rubber × 96.
Check the source ↗ · 1.0 snapshot
Game and item names below retain the source’s English identifiers so you can find them in the linked documentation.