Satisfactory · Rotors stators and motors | Compare

Choose a variant below. Closely related recipes, conditions or opening branches are collected here so you can compare them without moving between almost identical pages.

The version and limits of the original source apply to every entry. Quantities and requirements belong to the named variant; do not add alternative recipes or opening lines together.

These options share a planning task. Their differences stay visible in the individual rows and calculators.

Using this reference

Choose a recipe for Rotors stators and motors, then choose the machine that will run it. The per-minute rate uses the recorded output, recipe duration and machine speed. Batch quantities answer how many materials a fixed number of operations consumes; the rate column answers how fast one selected machine processes them.

Increase the target rate to see the number of whole machines needed. Rounding up leaves some nominal spare capacity. This is a direct production step, not a balanced factory: upstream supply, transport and temporary interruptions still need to support the stated rate.

Motor

5 per minute · Buildings needed (rounded up): 12

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Rotor2 10
− Stator2 10
+ Motor1 5

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Motor · 12 Seconds

Rotor × 2 + Stator × 2 → Motor × 1

Station: Assembler

Alternate: Electric Motor · 16 Seconds

Electromagnetic Control Rod × 1 + Rotor × 2 → Motor × 2

Station: Assembler

Alternate: Rigor Motor · 48 Seconds

Rotor × 3 + Stator × 3 + Crystal Oscillator × 1 → Motor × 6

Station: Manufacturer

A worked example

Suppose you want 4 × Motor. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Rotor × 8 and Stator × 8.

Check the source ↗ · 1.0 snapshot

Stator

5 per minute · Buildings needed (rounded up): 12

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Steel Pipe3 15
− Wire8 40
+ Stator1 5

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Stator · 12 Seconds

Steel Pipe × 3 + Wire × 8 → Stator × 1

Station: Assembler

Alternate: Quickwire Stator · 15 Seconds

Steel Pipe × 4 + Quickwire × 15 → Stator × 2

Station: Assembler

A worked example

Suppose you want 4 × Stator. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Steel Pipe × 12 and Wire × 32.

Check the source ↗ · 1.0 snapshot

Rotor

4 per minute · Buildings needed (rounded up): 15

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Iron Rod5 20
− Screw25 100
+ Rotor1 4

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Rotor · 15 Seconds

Iron Rod × 5 + Screw × 25 → Rotor × 1

Station: Assembler

Alternate: Copper Rotor · 16 Seconds

Copper Sheet × 6 + Screw × 52 → Rotor × 3

Station: Assembler

Alternate: Steel Rotor · 12 Seconds

Steel Pipe × 2 + Wire × 6 → Rotor × 1

Station: Assembler

A worked example

Suppose you want 4 × Rotor. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Iron Rod × 20 and Screw × 100.

Check the source ↗ · 1.0 snapshot

Turbo Motor

1.875 per minute · Buildings needed (rounded up): 32

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Cooling System4 7.5
− Radio Control Unit2 3.75
− Motor4 7.5
− Rubber24 45
+ Turbo Motor1 1.875

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Turbo Motor · 32 Seconds

Cooling System × 4 + Radio Control Unit × 2 + Motor × 4 + Rubber × 24 → Turbo Motor × 1

Station: Manufacturer

Alternate: Turbo Electric Motor · 64 Seconds

Motor × 7 + Radio Control Unit × 9 + Electromagnetic Control Rod × 5 + Rotor × 7 → Turbo Motor × 3

Station: Manufacturer

Alternate: Turbo Pressure Motor · 32 Seconds

Motor × 4 + Pressure Conversion Cube × 1 + Packaged Nitrogen Gas × 24 + Stator × 8 → Turbo Motor × 2

Station: Manufacturer

A worked example

Suppose you want 4 × Turbo Motor. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Cooling System × 16, Radio Control Unit × 8, Motor × 16, and Rubber × 96.

Check the source ↗ · 1.0 snapshot

Game and item names below retain the source’s English identifiers so you can find them in the linked documentation.

Back to the collection →