Satisfactory · Elevator structural parts | Compare

Choose a variant below. Closely related recipes, conditions or opening branches are collected here so you can compare them without moving between almost identical pages.

The version and limits of the original source apply to every entry. Quantities and requirements belong to the named variant; do not add alternative recipes or opening lines together.

These options share a planning task. Their differences stay visible in the individual rows and calculators.

Using this reference

Choose a recipe for Elevator structural parts, then choose the machine that will run it. The per-minute rate uses the recorded output, recipe duration and machine speed. Batch quantities answer how many materials a fixed number of operations consumes; the rate column answers how fast one selected machine processes them.

Increase the target rate to see the number of whole machines needed. Rounding up leaves some nominal spare capacity. This is a direct production step, not a balanced factory: upstream supply, transport and temporary interruptions still need to support the stated rate.

Versatile Framework

5 per minute · Buildings needed (rounded up): 12

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Modular Frame1 2.5
− Steel Beam12 30
+ Versatile Framework2 5

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Versatile Framework · 24 Seconds

Modular Frame × 1 + Steel Beam × 12 → Versatile Framework × 2

Station: Assembler

Alternate: Flexible Framework · 16 Seconds

Modular Frame × 1 + Steel Beam × 6 + Rubber × 8 → Versatile Framework × 2

Station: Manufacturer

A worked example

Suppose you want 7 × Versatile Framework. This recipe produces 2 per operation, so you need 4 operations. That produces 8 in total, leaving 1 extra. The direct material list is Modular Frame × 4 and Steel Beam × 48.

Check the source ↗ · 1.0 snapshot

Smart Plating

2 per minute · Buildings needed (rounded up): 30

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Reinforced Iron Plate1 2
− Rotor1 2
+ Smart Plating1 2

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Smart Plating · 30 Seconds

Reinforced Iron Plate × 1 + Rotor × 1 → Smart Plating × 1

Station: Assembler

Alternate: Plastic Smart Plating · 24 Seconds

Reinforced Iron Plate × 1 + Rotor × 1 + Plastic × 3 → Smart Plating × 2

Station: Manufacturer

A worked example

Suppose you want 4 × Smart Plating. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Reinforced Iron Plate × 4 and Rotor × 4.

Check the source ↗ · 1.0 snapshot

Modular Engine

1 per minute · Buildings needed (rounded up): 60

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Motor2 2
− Rubber15 15
− Smart Plating2 2
+ Modular Engine1 1

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Modular Engine · 60 Seconds

Motor × 2 + Rubber × 15 + Smart Plating × 2 → Modular Engine × 1

Station: Manufacturer

A worked example

Suppose you want 4 × Modular Engine. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Motor × 8, Rubber × 60, and Smart Plating × 8.

Check the source ↗ · 1.0 snapshot

Game and item names below retain the source’s English identifiers so you can find them in the linked documentation.

Back to the collection →