Satisfactory · Aluminum components | Compare

Choose a variant below. Closely related recipes, conditions or opening branches are collected here so you can compare them without moving between almost identical pages.

The version and limits of the original source apply to every entry. Quantities and requirements belong to the named variant; do not add alternative recipes or opening lines together.

These options share a planning task. Their differences stay visible in the individual rows and calculators.

Using this reference

Choose a recipe for Aluminum components, then choose the machine that will run it. The per-minute rate uses the recorded output, recipe duration and machine speed. Batch quantities answer how many materials a fixed number of operations consumes; the rate column answers how fast one selected machine processes them.

Increase the target rate to see the number of whole machines needed. Rounding up leaves some nominal spare capacity. This is a direct production step, not a balanced factory: upstream supply, transport and temporary interruptions still need to support the stated rate.

Aluminum Casing

60 per minute · Buildings needed (rounded up): 1

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Aluminum Ingot3 90
+ Aluminum Casing2 60

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Aluminum Casing · 2 Seconds

Aluminum Ingot × 3 → Aluminum Casing × 2

Station: Constructor

Alternate: Alclad Casing · 8 Seconds

Aluminum Ingot × 20 + Copper Ingot × 10 → Aluminum Casing × 15

Station: Assembler

A worked example

Suppose you want 7 × Aluminum Casing. This recipe produces 2 per operation, so you need 4 operations. That produces 8 in total, leaving 1 extra. The direct material list is Aluminum Ingot × 12.

Check the source ↗ · 1.0 snapshot

Alclad Aluminum Sheet

30 per minute · Buildings needed (rounded up): 2

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Aluminum Ingot3 30
− Copper Ingot1 10
+ Alclad Aluminum Sheet3 30

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Alclad Aluminum Sheet · 6 Seconds

Aluminum Ingot × 3 + Copper Ingot × 1 → Alclad Aluminum Sheet × 3

Station: Assembler

A worked example

Suppose you want 10 × Alclad Aluminum Sheet. This recipe produces 3 per operation, so you need 4 operations. That produces 12 in total, leaving 2 extra. The direct material list is Aluminum Ingot × 12 and Copper Ingot × 4.

Check the source ↗ · 1.0 snapshot

Heat Sink

7.5 per minute · Buildings needed (rounded up): 8

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Alclad Aluminum Sheet5 37.5
− Copper Sheet3 22.5
+ Heat Sink1 7.5

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Heat Sink · 8 Seconds

Alclad Aluminum Sheet × 5 + Copper Sheet × 3 → Heat Sink × 1

Station: Assembler

Alternate: Heat Exchanger · 6 Seconds

Aluminum Casing × 3 + Rubber × 3 → Heat Sink × 1

Station: Assembler

A worked example

Suppose you want 4 × Heat Sink. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Alclad Aluminum Sheet × 20 and Copper Sheet × 12.

Check the source ↗ · 1.0 snapshot

Game and item names below retain the source’s English identifiers so you can find them in the linked documentation.

Back to the collection →