Factorio · Speed module tiers | Compare

Choose a variant below. Closely related recipes, conditions or opening branches are collected here so you can compare them without moving between almost identical pages.

The version and limits of the original source apply to every entry. Quantities and requirements belong to the named variant; do not add alternative recipes or opening lines together.

These options share a planning task. Their differences stay visible in the individual rows and calculators.

Using this reference

Choose a recipe for Speed module tiers, then choose the machine that will run it. The per-minute rate uses the recorded output, recipe duration and machine speed. Batch quantities answer how many materials a fixed number of operations consumes; the rate column answers how fast one selected machine processes them.

Increase the target rate to see the number of whole machines needed. Rounding up leaves some nominal spare capacity. This is a direct production step, not a balanced factory: upstream supply, transport and temporary interruptions still need to support the stated rate.

Speed module

2 per minute · Buildings needed (rounded up): 30

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Advanced circuit5 10
− Electronic circuit5 10
+ Speed module1 2

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Speed module · 15 Seconds

Advanced circuit × 5 + Electronic circuit × 5 → Speed module × 1

Station: Assembling machine 1 / Assembling machine 2 / Assembling machine 3

A worked example

Suppose you want 4 × Speed module. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Advanced circuit × 20 and Electronic circuit × 20.

Check the source ↗ · 2.0.77 base

Speed module 2

1 per minute · Buildings needed (rounded up): 60

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Speed module4 4
− Advanced circuit5 5
− Processing unit5 5
+ Speed module 21 1

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Speed module 2 · 30 Seconds

Speed module × 4 + Advanced circuit × 5 + Processing unit × 5 → Speed module 2 × 1

Station: Assembling machine 1 / Assembling machine 2 / Assembling machine 3

A worked example

Suppose you want 4 × Speed module 2. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Speed module × 16, Advanced circuit × 20, and Processing unit × 20.

Check the source ↗ · 2.0.77 base

Speed module 3

0.5 per minute · Buildings needed (rounded up): 120

Ingredients / Products · Number of cycles: 1
Source dataBatchesper minute
− Speed module 24 2
− Advanced circuit5 2.5
− Processing unit5 2.5
+ Speed module 31 0.5

Rates use the selected building at base speed. No modules, beacons, quality, power shortages or overclocking are simulated. Fractional outputs are expected averages, not guaranteed drops.

per minute = Batches × 60 × Production building / seconds per cycle

Speed module 3 · 60 Seconds

Speed module 2 × 4 + Advanced circuit × 5 + Processing unit × 5 → Speed module 3 × 1

Station: Assembling machine 1 / Assembling machine 2 / Assembling machine 3

A worked example

Suppose you want 4 × Speed module 3. This recipe produces 1 per operation, so you need 4 operations. That produces 4 in total. The direct material list is Speed module 2 × 16, Advanced circuit × 20, and Processing unit × 20.

Check the source ↗ · 2.0.77 base

Game and item names below retain the source’s English identifiers so you can find them in the linked documentation.

Back to the collection →